Draft-002 Decision progress
From Yadis
The agreed decision process for Draft-002 is:
1. Let requirements be submitted for consideration. These are at Draft-002 Requirements
2. Let draft proposals be submitted for consideration. These are at Draft-002 Alternatives
3. Let individuals in the community provide feedback on the submitted requirements and draft proposals.
4. Have a face-to-face meeting, which will result in a decision. This meeting is scheduled for Thursday 1 December, 11am, at SixApart, in the City.*
5. Implement, inspect and adapt. At the same time, draft a Yadis specification document.
6. Implement, inspect and adapt, based on the draft Yadis specification.
7. Publish Yadis Secification 1.0.
To participate in the discussion:
1) Use this wiki:
2) Use the Yadis mailing list:
For a record of the discussion on the list, see the Yadis list archive.
* Oops, sorry: in San Francisco.